| Customization: | Available |
|---|---|
| After-sales Service: | Video Technical Support, Engineer Assigning |
| Temperature: | Customization |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product Description
Liquor Juice Store Glass Door Cold Storage Room Freezer Display Walk-in Cooler
Introduction of Display Walk-in Cooler:
A cold storage facility is a facility used to store and preserve food and items, usually for refrigerated or frozen food, vegetables, fruits, meat, seafood, and other perishable goods. This cold storage can be installed in existing buildings or custom-designed as part of a product of unconventional shape or size.
Cold storage facilities are usually modular in design, consisting of prefabricated cold storage wall panels and insulation materials, which can be installed quickly and cost less than traditional reinforced concrete buildings. Such cold storage facilities usually have good thermal insulation and moisture resistance, and can effectively control temperature and humidity to ensure the freshness and quality of stored items.
Cold storage facilities usually need to be equipped with refrigeration units and control systems to maintain constant temperature and humidity. These cold storage facilities can be customized according to specific needs, including refrigeration temperature range, storage capacity, door type, and other functions. Through scientific design and reasonable management, cold storage facilities can play an important role in keeping food fresh, extending the life of goods, and saving energy consumption.
Start Walk-in Cooler Project and get a shelf for free(CE Verified)



Walk-in Cooler Features:
| 1. Temperature range: Between ±5°C commonly for vegetables and fruit; -18°C or below for meat or seafood. Target temperature and cooling time for deep freezing room. |
| 2. Size: According to your business. and we can design for you |
| 3. Function: preservation, freezing, quick freezing |
| 4. Excellent performance, Low operating sound, professional and reliable |
| 5. OEM, ODM, IDM for your business. |
| 1: What is the dimension of a cold room? or drawing if you have? | |
| 2: What kind of goods will be stored inside? | |
| 3: What's the local industry voltage? |
| Pre-Sale | CAD Drawing;3D Drawing; Show you pictures and videos about your ideal project | |
| On-Sale | Production and Packing visualization; | |
| After-Sale | Loading the goods, Technical drawings, and Installation Instructions. 24/7 Support & Service |


| The protective packaging of the Smart Packaged Unit: |
| 1. Wooden box for condensing unit and evaporator |
| 2. Pallet system for transport |
| The protective packaging of the PU Panel: |
| 1, PVC film packaging or Carton wrap |
| 2. Four-corner cardboard protection to prevent impact |

| 1. Does your product need to stay fresh for months, weeks, or days? |
| If your product needs to stay fresh for weeks or months, it would preferably be frozen (if possible). However, a product that needs to stay fresh for days to weeks would be fine if kept refrigerated. |
| 2. Does your product need to stay cool, slightly frozen, or at room temperature? |
| Certain foods, like bananas, for example, go bad when they are kept at a temperature that is too low. Their ideal storage temperature would therefore be a little closer to room temperature. |
| 3. Does your product need to stay dry, or slightly humid? |
| Some products tend to dry out if the relative humidity is kept too low, this affects the overall quality of the taste, appearance, weight, etc. of the product. Especially in vegetable storage a low RH can be unfavorable as the weightloss of the product causes the farmer to evaporate his profit. |
| 4. Does your product still need to ripen? |
| Storing bananas during shipping versus during ripening requires different environments. |
| 5. What is the MOQ? |
| 1pcs and we are welcome to enjoy factory price, buy more to get a discount |
| 6. Can you provide samples? |
| Available, Welcome to contact us for details |
| 7. How long is the lead time? |
| 35 days maximum for production in general voltage, 45 days maximum for customized voltage, PUR panels, and spare parts is 10 days maximum for the project commonly. |